Flow activation after change set deploy

Key Takeaway

By default, a flow in a change set arrives in its destination org inactive, even if it was active in the sandbox. You must activate it manually after deployment.

By default, moving a flow from a sandbox to production with a change set leaves work to do: an app builder must check the flow in production and activate it manually. A production-only setting can deploy processes and autolaunched flows as active instead, but only when flow test coverage requirements are met.

Flow versions in a change set

A change set can include only one version of a flow. If the flow has no active version when you upload the outbound change set, the change set uses the latest inactive version.

Deploying or redeploying a flow with a change set creates a new version of the flow in the destination org, so each new deployment adds a version rather than replacing one. Repeated deployments leave several versions of the same flow in production, so confirm that you are activating the correct version.

Platform App Builder Study Guide

Checklist progress

0/340Learned

Given a use case, demonstrate knowledge, viability, and troubleshooting when using change sets

0/17

Prepare for the Exam

Play Today's Certle

Study Community

Ask questions and get the latest info from other Platform App Builder studiers.